Stabirail
|
monday
30 march
|
On appointment |
| On appointment | |
|
tuesday
31 march
|
On appointment |
| On appointment | |
|
wednesday
25 march
|
On appointment |
| On appointment | |
|
thursday
26 march
|
On appointment |
| On appointment | |
|
friday
27 march
|
On appointment |
| On appointment | |
|
saturday
28 march
|
Closed |
|
sunday
29 march
|
Closed |
Any information incorrect? Please let us know!
| Closed on monday 6 april 2026 for Easter Monday |
| Doornpark 10
, 9120 Beveren map |
|
|---|---|
| Phone: | +32 485 55 27 75 |
| E-mail: | info@stabirail.com |
| Website: | stabirail.com |
Stabirail has designed and developed a new method for ballastless track or slab track construction in tunnels and railway stations. Our ground-breaking system has proven to be the most efficient method for laying ballastless railway tracks in concrete beds. Furthermore our new slab track or ballastless track construction method guarantees higher accuracy, longer design life and lower whole-life cost.